T-North Expansion

- Location: Taylor, BC - Gordondale, Alberta; and Taylor - Spectra Energy’s Station 2
- Scope:
- Installation of a new 13,000 horsepower compressor unit at Spectra Energy’s existing CS-AI Gordondale site, along its 26" Alberta Mainline
- Upgrade an existing gas turbine
- Capacity:
- Increase eastbound transportation capacity by 153 million cubic feet per day (MMcf/d) from Spectra Energy’s McMahon Plant in Taylor, BC, to interconnecting pipelines near Gordondale, Alberta
- Increase westbound capacity by 112 MMcf/d from the McMahon Plant to Compressor Station 2 at the interconnection with the company's Transmission South system, near Chetwynd, BC
- Ownership: 100%
- Projected Completion Date: November 2010
- In-Service for Compression: January 2010
|
|
|
|