Our Growth Projects
U.S. Gas Transmission Expansion Projects
- Location: Connecticut and New York
- Length: 50 miles
- Capacity: 260 million cubic feet per day
- Ownership Interest: 50 percent Spectra Energy, 50 percent Keyspan Energy
- Projected Completion Date: Post 2010
HubLine/East to West Expansion Project
- Location: Massachusetts and Connecticut
- Length: 12.9 miles of new pipeline and 18.5 miles of replacement pipe
- Capacity: 1.0 billion cubic feet per day
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: November 2009
- Location: Medford and Somerville, Massachusetts
- Scope: Approximately 2 miles of 14-inch diameter loop pipeline
- Interconnects: NSTAR Gas Company
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: Fall 2009
Maritimes & Northeast Phase IV
- Location: Maine and Massachusetts
- Facilities in the U.S.: Approximately 1.7 miles of 30-inch diameter pipeline loop located adjacent to its existing pipeline in Baileyville, Maine; five new compressor stations in the communities of Eliot, Westbrook, Searsmont, Brewer and Woodchopping Ridge in Maine; two new meter stations in Baileyville and Westbrook, Maine; modifications to existing compressor stations in Baileyville and Richmond, Maine and to existing meter stations in Baileyville, Maine and Dracut, Massachusetts.
- Capacity: Increase of approximately 418,000 dekatherms per day (Dth/d) to approximately 833,000 Dth/d
- Ownership Interest: 77.53 percent Spectra Energy; 12.92 percent Emera, Inc.; 9.55 percent ExxonMobil Corporation
- Projected Completion Date: November 2008
- Location: Copiah, Mississippi
- Interconnects: Texas Eastern Transmission and Southeast Supply Header
- Capacity: Certificated for 15.5 Bcf
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: Initial in-service 2011; full capacity 2015
- Location: Clarington, Ohio to Oakford / Delmont, Pennsylvania
- Interconnects: Texas Eastern Transmission, LP and Clarington, Ohio supply point
- Capacity: Up to 500 million cubic feet per day
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: November 2009
- Location: New Jersey, New York and Connecticut
- Scope: Approximately 4.8-miles of 42" take-up and relay, over 81,000 HP of additional compression and two meter station modifications
- Capacity: 325,000 dekatherms per day
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: November 2008
- Location: Louisiana, Mississippi, Alabama
- Facilities: Approximately 270 miles of pipeline, three mainline compressor stations, two booster compressor stations, and interconnecting facilities
- Capacity: Approximately 1 Billion cubic feet per day
- Ownership Interest: 50-50 Joint Venture between Spectra Energy and CenterPoint Energy Gas Transmission
- Projected Completion Date: (see Informational Update)
- Location: Bedford County, Pennsylvania
- Interconnects: Texas Eastern Transmission, LP and Dominion Transmission
- Capacity: 12 billion cubic feet (Bcf)
- Ownership Interest: 50 percent Spectra Energy Transmission, LLC and 50 percent NJR Steckman Ridge Storage Company
- In-Service Date: April 2009
- Location: Ohio and Pennsylvania
- Capacity: 455 million cubic feet per day
- Projected In-Service Date: November 2010
Texas Eastern Appalachia to Market Expansion Program (TEAM)
- Location: Ohio, West Virginia, Pennsylvania
- Scope: Multiple year supply connection and expansion program that can grow each year as the production grows
- Capacity: Targeting 300 million cubic feet per day, but project can be scaleable and sized to meet customer needs and based on actual commitments
- Interconnects: 30 plus
- In-service Dates: as early as 2011 with additional interest ramping up over the next few years as production efforts expand
- Ownership Interest: 100 percent Spectra Energy
- Location: Pennsylvania and New Jersey
- Length: 11 miles
- Capacity: 900 million cubic feet per day
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: 4Q 2011
Spectra Energy Partners Expansion Projects
East Tennessee Natural Gas Greenway Project Open Season
Union Gas Expansion Projects

Dawn Storage Deliverability Project
- Location: Dawn Storage Operations – near Sarnia, Ontario
- Elements: 11 wells and related gathering lines, addition of [up to] 47,000 hp of natural gas compression
- Capacity: Increase of 485 million cubic feet per day
- Project Completion Date: Fall, 2008
- Status: Construction underway
Dawn-Trafalgar Transmission Expansion
- Location: Bright, Ontario
- Elements: Addition of [up to] 45,000 hp of natural gas compression.
- Capacity: Increase of 360 million cubic feet per day
- Projected Completion Date: Fall, 2008
- Status: Construction underway
Heritage Natural Gas Storage Pool Project
- Location: Near Sarnia, Ontario
- Elements: Development of a natural gas storage pool.
- Capacity: Increase of one billion cubic feet of natural gas storage
- Projected Completion Date: 2009
The Tipperary Storage Pools Project
- Location: Huron County, Ontario
- Elements: development of the Tipperary North and South natural gas storage pools.
- Capacity: Three billion cubic feet of new natural gas storage
- Projected Completion Date: Spring, 2008
- Status: Pools are being filled, dehydrator to be installed
TransCanada Energy - Halton Hills Generating Station Pipeline Project
- Location: Halton Hills, Ontario
- Elements: Natural gas pipeline to serve a new 683 MW gas fired electricity generating plant
- Projected Completion Date: August, 2009
- Status: OEB Approval received
Western Canada Expansion Projects
Pine River De-Bottleneck and Looping Project
- Location: Chetwynd, British Columbia
- Length: 17 km
- Capacity: 40 million cubic feet per day of gathering capacity
- Ownership Interest: 100 percent Spectra Energy
- Projected Completion Date: November 2008
- Location: South Peace area of northeast BC
- Length: 86.1 kilometres
- Capacity: 221 mmcf/d
- Projected In-service Date: Q3 2009
- Cost: Approximately C$100 million
- Location: Peace River Arch area, NE British Columbia
- Length: 54 km pipeline
- Plant Ownership Interest: 100 percent Midstream
- Pipeline Ownership Interest: 50 percent Midstream
- Plant Capacity: 30 million cubic feet per day expansion; total West Doe capacity will be 53.5 million cubic feet per day
- Plant Completion Date: January 2009 (pending regulatory approvals)
- Pipeline Completion Date: April 2008
- Cost: Approximately C$41 M